The U.S. electrical automobile maker Lucid leaped previous a number of milestones on Tuesday. With an official commissioning ceremony for its Casa Grande, Arizona manufacturing plant that includes Arizona governor Doug Ducey, and shows by CEO and CTO Peter Rawlinson and manufacturing VP Peter Hochholdinger, it reported that it has produced the primary “customer-quality” automobiles.
Lucid now has approvals from the EPA and U.S. Department of Transportation, in addition to the FCC and FDA (for lidar), Rawlinson summed. That means it’s cleared to ship automobiles—and it stated that it’ll begin doing so later in October.
In the meantime, for this firm that’s centered on setting a excessive bar for high quality, these first manufacturing automobiles, with VINs, might be used for firm functions like check drives.
The firm additionally revealed that it’s exceeded 13,000 reservations for the Air.
Lucid CEO Peter Rawlinson – Arizona plant commissioning
The Lucid Air was just lately EPA-rated at 520 miles in its debut Dream Edition Range type, costing $169,000 (not but together with a vacation spot cost). Production of the Lucid Air Grand Touring, which presents as much as 516 miles and prices $139,000, will ramp up earlier than the top of the 12 months.
With the shift to manufacturing automobiles, Lucid has additionally adjusted its itemizing of the battery pack’s capability to 112 kwh, which suggests it goes a superb 4.6 miles per kwh.
“Our technology will allow for increasingly lighter, more efficient, and less expensive EVs, and today represents a major step in our journey to expand the accessibility of more sustainable transportation,” stated Rawlinson.

Lucid Motors AMP-1 manufacturing facility, Casa Grande, Arizona
Lucid famous that it accomplished its manufacturing facility, referred to as AMP-1, in lower than a 12 months. The firm claims that it’s the primary greenfield dedicated-EV manufacturing facility to be in-built North America.
An enlargement resulting from be completed by 2023 will increase the manufacturing facility’s capability to 90,000 automobiles a 12 months, transfer propulsion-system manufacturing (now completed at a separate close by facility) underneath the identical roof, and make room for the what comes subsequent, the Gravity SUV.
As a part of Tuesday’s occasion, attended a manufacturing facility tour and Air preview. There’s way more to return.